We have recently completed installing all the AC power side of a 40KV solar PV system at West Park Primary School in Hartlepool

Solar PV metering before feeding into the schools supply

Solar PV metering before feeding into the schools supply

DB and switched isolator at the input end of the solar PV system

DB and switched isolator at the input end of the solar PV system

Three Phase Distribution Board for the input of the 40 Kv Solar Pv system

Three Phase Distribution Board for the input of the 30 KW  Solar Pv system